Showing posts with label crewing. Show all posts
Showing posts with label crewing. Show all posts

Saturday, September 4, 2010

Jump off point Faro

After making it down to the Algarve, it has been a leisurely cruise. The last couple of days we met up with the crew for the Madeira crossing and enjoyed some days of relative rest. After getting supplies yesterday for the 500 Mile crossing, this morning Ingrid has left Faro by plane and her brother Marc by car, while we'll be leaving soon in the opposite direction.

It'll be ten weeks before I meet Ingrid again in Cape Verde, so we're lucky there is something like Skype to see one another from time to time. Of course this time I won't be alone for as long as I was in Póvoa, so there'll be plenty of distraction, but still...

We've been in Olhão the last two days, and it is nice to have that typical Portuguese atmosphere down South. The last couple of cities we stayed in were much more touristic and while this one obviously has lots of tourists, it still feels authentic enough with its winding cobbled streets and tiled houses.

So after enjoying the South coast and the Faro lagoon, we're off to Funchal where we'll arrive around Friday and a long way further South and West.

Monday, July 19, 2010

The Cape Route

Exactly a week after leaving Jersey, we finally made it to Brest. South Westerly winds, a Southerly storm force 9 and seaweed contrived to keep us from getting West. We spent three days near Tréguier waiting for the weather to improve, playing Colonists of Catan and visiting the bar on shore for ice cream. It's called Pesked and is very picturesque and they have good mussels. The oysters, however, may have had something in them as all of us got sick two days after eating them.

S8003574

Once we got going, the North Westerly the forecast promised turned out to be rather Westerly, so no good progress was made and lots of diesel used. After the tide turned in favor for us, the waves got even higher so we made a short stop to sleep somewhere near Morlaix. After the wind and tide turned again, we left to make for Ouessant.

The wind was North Westerly at last, but it didn't last. After two hours, we were beating into a Westerly again and the engine stayed on for the next 12 hours. We had just rounded Portsall on the outer tip of Brittany, when a big field of sea weed got pulled into the propellor and stalled the engine. Just prior to it dying, I got it out of gear and now we were stuck with a prop full of weed and neither forward or reverse made it come free. So we stopped the engine.

Now we were drifting slowly towards the rocky passage of the Chenal Du Four, with hardly a Force 2 South Westerly and no engine. But as we tried gaining speed, the prop started turning along. So we tried starting the engine and it worked, but only forward. So we made for Camaret at slow speed. By 6 a.m. I tied to a buoy in the bay of Camaret and later, dove to free the prop from a thick layer of weed.

Later that day, I sailed the boat with two sick crew and a rather bad lack of sleep to Brest, where we moored next to the visitors pontoon at 5 p.m.

We were in Brest, and ready for the first big crossing.

Monday, July 12, 2010

South, always South.

It's been a roller coaster ride up till now. Our departure was delayed due to bad weather, but on Monday evening we finally left.

S8003546

Lots of family and some friends made it to wave us goodbye, for which my thanks!

We set off with 6 crew, Troy and Helen from China, Ines and Tony from Belgium and Ingrid and me, obviously. Our first evening and night was uneventful, we sailed and motored and soon we were past Calais and getting some distance between us and the traffic system. Helen, unfortunately, was never without sea sickness. She managed to get some sleep in between of her exhausting dizziness, but could hardly eat or drink. After a rough night on the third day, on which we stopped over at Omonville-la-Rogue, just past Cherbourg, a decision was made.

Troy and Helen would get off the boat at St. Helier, on Jersey. This would put me two crew short for the Biscay crossing. Since this was already the 8th of July, it would be difficult to find new crew for the next part. So once we made it to St. Helier, I got busy with internet connections, e-mail and contacts I made earlier while looking for crew.

After a nice day at St. Helier, we left the following morning - or so we thought. Upon starting the engine, nothing happened. This was a first, and with only 30 minutes before the tidal gate shut, a tough decision was made to get a mechanic in order to make it for the next tide.

An hour later, a robust man showed up, said hi and jumped into the engine room. After a minute or so, he said to start the engine, got into the other side and said start her now. And at the first turn of the switch, she started! It turned out a wire had come loose from the starter motor. 10 Euros later, we were a happy crew again and the rest of the morning was spent in laziness.

Getting to St. Malo in Brittany was easy enough, although now we had to make the approach in the dark, as we couldn't start in Jersey until 4 p.m. But with the help of our trusted chart plotter, we got in alright and at 4 a.m. the next morning, tied on to the last available berth. We got around the Cherbourg promontory alright, although with 2 crew members less than planned.

Monday, September 28, 2009

Finding crew is fun

At a party I threw last Saturday, I announced the trip and got a lot of crew in return. I had displayed the trip dates and some graphic representations of the route and invited people to put their names down. I was surprised to get as many interested folk to sail along for a short (1 week) or longer (up to 3 months!) period. Of course, there is still a lot of explaining, checking and organizing to do, but getting this kind of encouragement is fantastic.

For those interested in the exact route, these are the legs:

Ostend to Brittany: July 3rd to 15th 2010
Brittany to Porto: July 18th to August 1st 2010
Porto to Faro: August 15th to 31st 2010
Faro to Madeira: September 1st to 9th 2010
Madeira to Tenerife (Canaries): October 1st to 7th 2010
Tenerife to Boavista (Cape Verde): October 26th to November 1st 2010
Boavista to Grenada: December 5th to 28th 2010 (First crossing)
Then we island-hop along the Caribbean
Martinique: January 15th 2011
Dominica: January 29th 2011
Guadeloupe: February 6th 2011
Antigua: February 19th 2011
St Kitts: March 5th 2011
Anguilla: March 26th 2011
Tortola to Faial: April 21st 2011 (Second crossing)
Visiting Azores: May 8th to May 29th 2011
Faial to Scilly's: May 30th to June 5th 2011
Scilly's to Boulogne: June 24th to 29th 2011
Boulogne to Ostend: June 30th to July second 2011

I feel I've taken enough time to be able to reach every stop along the way and still be able to organize crew for the longer legs. Starting days are generally in a weekend, so relatives and friends joining us along the way, can arrange flights and so on.

I'm not entirely certain if the conditions for the second crossing will turn out to be good enough, but there is some spare time for that trip. I've read several pages of advice, and none are conclusive as to when to start and which route to take. There is the Azores High to contend with, so taking plenty of fuel seems paramount for this leg.

At the moment, I'm very pleased with all the excellent feedback I've gotten.